In the second quarter (Q2) of 2024, 5 GW of solar capacity was commissioned, a 49% decline from the 9.9 GW installed in Q1 2024. However, Q2 installations rose 170% year-over-year (YoY) compared to 1.8 GW in Q2 2023. PrevNext