The 2019 PIL had called attention to the hazard overhead power lines pose to GIBs, to which the apex court had, in April 2021, responded by imposing a blanket ban on the laying of overhead power lines, and ordering the installation of bird flight divertors (BFDs) and the undergrounding of the existing high-tension cables.