Suzlon will install 13 wind turbine generators (WTGs) with a hybrid lattice tubular (HLT) tower and a rated capacity of 3 MW each. The project, to be located at Thalaikattupuram, Tuticorin in Tamil Nadu, is expected to be commissioned in 2024.