GE Renewable Energy announced the shipment of the four tower sections that will be part of GE’s Haliade-X 12 MW prototype to be installed later this summer in Maasvlakte-Rotterdam (NL). The four segments at tower manufacturer GRI’s site in Seville, will be arriving in the Netherlands before the end of the month.